b. For compressible seals refer to the manufacturers installation instructions. c. Substrate to receive frame seals should be free of contamination and installed in accordance with manufacturers installation instructions. E. Wind loading 1. General a. Dryvit UK Ltd are responsible for the design of the EWI cladding system and the. parapet caps. Refer to the Dryvit Outsulation LCMD Systems Installation Details, DS and contract documents. d. Hold system a minimum of 8 in ( mm) above flat roofs; 2 in (51 mm) above sloped roofs. 3. Openings. a. Heads, jambs and sills of all openings shall be prepared with Dryvit Flashing Tape™ or other. contract documents and Dryvit ACR System Installation Details. • For windows or doors that do not have integral flashing, a field-applied flashing shall be installed in accordance with industry guidelines, manufacturer's instructions and contract.
eaves/chimney intersections and sloped roof/wall intersections. Refer to the Dryvit Outsulation Plus MD System Installation Details, DS d. Hold system a minimum of 8 in ( mm) above flat roofs; 2 in (51 mm) above sloped roofs. 3. Openings. a. Heads, jambs and sills of all openings shall be prepared with Dryvit Backstop ® NT™, AquaFlash® System. install the Dryvit system first; the frieze boards are installed over the Dryvit system and sealed as required. CRICKETS/CHIMNEY ENCLOSURE Crickets are designed to deter the accumulation of snow and ice and deflect water around a chimney. To finish masonry enclosures, it is recommended that a skim coat of base coat be applied prior to. Dryvit Grid Tape is a tough, self-adhering, self-healing construction grade tape used to seal rough openings in walls utilizing a Dryvit system by bridging the joints between sheathing and other underlying framing or foundation components.
for the installation of Dryvit Systems, Inc. Architectural Manual or www.doorway.ru for additional information.) PERFORMANCE TEST STANDARDS. Dryvit One-Coat. DUK 2. Table of Contents. Section I. General Installation Requirements. Section II. Mixing Instructions. Section III. Application. Instructions. DS 3. I. General Installation Requirements. A. Project Conditions. 1. Storage of Dryvit Materials a. Materials shall be stored at the job.
0コメント